Arkansas Highway 5: Hot Springs to Fountain Lake – 2023 Hot Springs Bypass Extension

🚙 Drive America’s Highways for 6 miles north along Arkansas Highway 5 from Hot Springs to Fountain Lake, Arkansas.

The Hot Springs Bypass extension – Arkansas Highway 5, opened September 18, 2023, connects the existing Hot Springs Bypass (US-70/US-270) with Arkansas Highway 7 and the existing Arkansas Highway 5 in Fountain Lake. The new highway is 5.8 miles long and cuts through the Ouachita Mountains as it snakes its way through rural Garland County.

Our ride starts at the south end of the extension at a full interchange with U.S. Highway 70/U.S. Highway 70B in Hot Springs. Driving generally north, we pass the interchange with Mill Creek Rd before reaching the end of the ride at the roundabout with Arkansas Highway 7 in Fountain Lake..

More info on this extension: https://twitter.com/myARDOT/status/1703859845735010538/photo/1

Watch this video in 4K and in real-time: Become a member today

Was this content helpful?

Donate Thanks
×

Join the Express Lane! Support Interstate 411 and enjoy crystal-clear 4K videos in real-time. Upgrade to ad-free access for just a little extra.

Plans start at $3/mo. Save big with an annual plan.

⇨ Join at Interstate411.us
⇨ Join at YouTube

Access the Express Lane

 

Thank you to our Express Lane Members, both on YouTube and Interstate411.us.