Arkansas Highway 5: Fountain Lake to Hot Springs – 2023 Hot Springs Bypass Extension

🚙 Drive America’s Highways for 6 miles south along Arkansas Highway 5 from Fountain Lake to Hot Springs, Arkansas.

The Hot Springs Bypass extension – Arkansas Highway 5, opened September 18, 2023, connects the existing Hot Springs Bypass (US-70/US-270) with Arkansas Highway 7 and the existing Arkansas Highway 5 in Fountain Lake. The new highway is 5.8 miles long and cuts through the Ouachita Mountains as it snakes its way through rural Garland County.

Our ride starts at the north end of the extension at a traffic circle with AR-7 and AR-5 in Fountain Lake. Driving generally south, we pass the interchange with Mill Creek Rd before reaching the end of the ride at the junction with U.S. Route 70 just east of Hot Springs.

Members get to watch this video in real-time and in 4k.  Join now at https://youtube.com/@interstate411/join

 

Was this content helpful?

Donate Thanks
×

Join the Express Lane! Support Interstate 411 and enjoy crystal-clear 4K videos in real-time. Upgrade to ad-free access for just a little extra.

Plans start at $3/mo. Save big with an annual plan.

⇨ Join at Interstate411.us
⇨ Join at YouTube

Access the Express Lane

 

Thank you to our Express Lane Members, both on YouTube and Interstate411.us.